One of our largest line-feed projects was for Ford Dearborn Stamping. This system used a unique tray concept to convey various racks to a Schuler Press for the production of the F-150 doors. This system has SGV trailer automatic interface, large rack 10,000 lb capacities and 15 operator workstation rack exchanges. At a production rate potential of 900 parts per hour this system provided dependable automatic rack exchanges with no fork trucks. A lower level of the system exchanges loaded and empty racks with the FMC SGV system and brings racks up to the second floor press output production for operator rack loading without the use of lift trucks.
CLICK ANY PICTURE FOR A LARGER VIEW
VCS
1st and 2nd Floor Side by Side with Transfers
Operator Interface Loading Station to High Speed Rack Transfer
Cart Interface to Side by Side for Loading and Unloading Racks on Trays
VCS Interfacing 1st and 2nd Floor Side by Sides with Transferring Racks on Trays
Offering a Leak Free Trailer Unloading System developed specifically to meet the growing liabilities and mandates requiring leak free waste transfer.
May 1, 2009
Offering a wide range of specialized trailers from wind blade and tower trailers to dollies, jeeps, step deck trailers, low boy detachable gooseneck trailers, extendable trailers and special design trailers.
Please contact MSI to learn about our minority partner LLC.